May, 2016 - Garner Industries Silo Addition and Pneumatic Conveying System to storage bins. Includes electrical control system and "turn-key" installation. Foundations to be poured in September 2016.
Read more
Refined Coal System
August 2014 - CETC was recently awarded the contract for a refined coal system with AES-Shady Point Power Sation. This involves moving equipment from an Illinois power station to AES Shady Point in Oklahoma. CETC will install used equipment with new to treat existing coal being transferred to the boiler house removing NOx and Mercury…
Read more