NorthStar BlueScope Steel (Ohio)

CETC was awarded the Feasibility study for an in-plant HBI/DRI Handling system to receive this material from the nearby Cliffs Mining HBI Plant in Toledo, Ohio via truck and/or rail.  The system provided for both long and short-term storage and transfer to “Twin Station” EAF’s inside the Melt Shop.  This study is to be followed…
Read more

Hastings Utilities, Hastings, Nebraska

CETC recently completed a plant upgrade to the refined coal process at this location.  Existing equipment was removed and a “new” system incorporating the use of Pocket Belt conveying and horizontal mixer to process the coal for two (2) coal-fired units at this Generating Power Station.  Removal of the existing equipment and installation of “new”…