NorthStar BlueScope Steel (Ohio)

CETC was awarded the Feasibility study for an in-plant HBI/DRI Handling system to receive this material from the nearby Cliffs Mining HBI Plant in Toledo, Ohio via truck and/or rail.  The system provided for both long and short-term storage and transfer to “Twin Station” EAF’s inside the Melt Shop.  This study is to be followed up by a Detailed Engineering Design by CETC for this system in the 4th quarter of 2018.

No Comments Yet.

Leave a comment

You must be Logged in to post a comment.